![]() |
2016 Tables and Figures | All Years of Tables and Figures | Most Recent Full Issue of the Digest |
![]() |
Download Excel ![]() |
Table 217.15. | Percentage of public schools with plans for major repair, renovation, or replacement of building systems or features in the next 2 years and percentage distribution of schools with such plans, by selected school characteristics, type of system or feature, and main reason for the plans: 2012-13 |
[Standard errors appear in parentheses] | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Type of system or feature and main reason for major repair, renovation, or replacement plans | All public schools | Instructional level | Community type | Percent of students eligible for free or reduced-priced lunch | ||||||||||||||||||||||||||||||||
Elementary | Secondary | Combined | City | Suburban | Town | Rural | Less than 35 percent | 35 to 49 percent | 50 to 74 percent | 75 percent or more | ||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | ||||||||||||||||||||||||
Roofs--percent of schools with plans | 19 | (1.1) | 17 | (1.3) | 25 | (1.8) | 25 | (6.8) | 19 | (2.1) | 19 | (2.0) | 20 | (3.0) | 19 | (1.9) | 22 | (1.8) | 18 | (2.4) | 17 | (2.0) | 18 | (2.3) | ||||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 39 | (3.1) | 38 | (3.9) | 41 | (4.4) | 31 | ! | (14.2) | 35 | (6.0) | 40 | (5.6) | 50 | (10.0) | 35 | (5.3) | 33 | (4.5) | 45 | (7.5) | 40 | (5.8) | 42 | (7.1) | |||||||||||
Improve operational or energy efficiency | 9 | (1.7) | 8 | (2.1) | 9 | (2.6) | 30 | ! | (15.1) | 6 | ! | (2.9) | 8 | ! | (3.0) | ‡ | (†) | 13 | ! | (4.1) | 6 | ! | (2.2) | ‡ | (†) | 8 | ! | (3.2) | 17 | ! | (5.4) | |||||
Replacement cycle | 46 | (3.1) | 47 | (4.2) | 45 | (4.7) | 38 | ! | (12.3) | 50 | (5.9) | 46 | (5.3) | 36 | (9.0) | 49 | (5.8) | 55 | (5.0) | 46 | (7.6) | 49 | (5.4) | 30 | (6.5) | |||||||||||
Other reason | 6 | (1.5) | 7 | ! | (2.2) | 5 | ! | (1.7) | # | (†) | 8 | ! | (3.7) | ‡ | (†) | ‡ | (†) | ‡ | (†) | 7 | ! | (2.9) | ‡ | (†) | ‡ | (†) | 11 | ! | (4.9) | |||||||
Framing, floors, foundations--percent of schools with | ||||||||||||||||||||||||||||||||||||
plans | 7 | (0.7) | 5 | (0.9) | 8 | (1.4) | 22 | ! | (6.8) | 7 | (1.2) | 7 | (1.3) | 7 | (2.0) | 5 | (1.1) | 6 | (1.1) | 5 | (1.3) | 6 | (1.4) | 8 | (1.6) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 41 | (4.9) | 40 | (6.2) | 42 | (7.1) | 48 | ! | (19.9) | 37 | (9.4) | 38 | (9.9) | 53 | (15.6) | 41 | (11.6) | 27 | ! | (8.1) | 58 | (12.6) | 37 | ! | (11.3) | 51 | (9.8) | |||||||||
Improve operational or energy efficiency | 16 | (3.8) | 12 | ! | (4.7) | 17 | ! | (6.6) | 43 | ! | (18.9) | 19 | ! | (8.9) | 14 | ! | (6.8) | 20 | ! | (9.6) | ‡ | (†) | 15 | ! | (6.7) | ‡ | (†) | 21 | ! | (9.0) | ‡ | (†) | ||||
Replacement cycle | 27 | (4.5) | 30 | (6.0) | 26 | (6.9) | ‡ | (†) | 27 | (7.5) | 23 | ! | (9.4) | ‡ | (†) | 32 | ! | (10.6) | 38 | (9.7) | ‡ | (†) | 33 | ! | (11.0) | 17 | ! | (7.5) | ||||||||
Other reason | 16 | (3.9) | 19 | ! | (5.7) | 15 | ! | (7.1) | # | (†) | 16 | ! | (7.4) | 24 | ! | (9.1) | ‡ | (†) | ‡ | (†) | 20 | ! | (8.9) | ‡ | (†) | ‡ | (†) | 16 | ! | (7.5) | ||||||
Exterior walls, finishes--percent of schools with plans | 9 | (0.7) | 8 | (0.9) | 10 | (1.3) | 17 | ! | (6.0) | 9 | (1.5) | 8 | (1.3) | 9 | (1.9) | 8 | (1.3) | 9 | (1.3) | 9 | (1.7) | 8 | (1.3) | 10 | (1.8) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 38 | (4.5) | 36 | (5.6) | 46 | (7.5) | ‡ | (†) | 33 | (7.1) | 39 | (9.5) | 53 | (11.8) | 35 | (8.9) | 38 | (8.1) | 37 | ! | (11.4) | 46 | (10.5) | 31 | (8.8) | |||||||||||
Improve operational or energy efficiency | 21 | (3.6) | 19 | (4.5) | 23 | ! | (7.1) | ‡ | (†) | 20 | ! | (7.0) | 17 | ! | (6.6) | 18 | ! | (7.3) | 26 | ! | (8.5) | 14 | ! | (5.4) | 20 | ! | (7.7) | 23 | ! | (9.3) | 29 | ! | (8.8) | |||
Replacement cycle | 23 | (3.7) | 26 | (5.1) | 18 | (4.9) | ‡ | (†) | 31 | (7.7) | 25 | ! | (7.7) | ‡ | (†) | 23 | ! | (8.1) | 32 | (8.1) | 18 | ! | (8.8) | 21 | ! | (7.6) | 19 | ! | (8.0) | |||||||
Other reason | 18 | (3.9) | 20 | (5.2) | 14 | ! | (5.9) | ‡ | (†) | 16 | ! | (7.3) | 19 | ! | (8.1) | 24 | ! | (11.5) | 15 | ! | (6.6) | 16 | ! | (7.4) | 25 | ! | (10.5) | ‡ | (†) | 20 | ! | (8.3) | ||||
Windows, doors--percent of schools with plans | 15 | (0.9) | 13 | (1.1) | 21 | (2.1) | 21 | ! | (6.7) | 15 | (2.1) | 14 | (1.8) | 18 | (2.7) | 16 | (1.8) | 15 | (1.8) | 15 | (2.2) | 15 | (1.9) | 16 | (2.2) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 30 | (3.4) | 29 | (4.5) | 31 | (4.8) | 40 | ! | (16.8) | 24 | (5.4) | 30 | (7.0) | 40 | (9.6) | 31 | (6.3) | 28 | (6.2) | 27 | (7.7) | 37 | (7.5) | 30 | (6.4) | |||||||||||
Improve operational or energy efficiency | 43 | (3.9) | 41 | (4.7) | 45 | (6.1) | 60 | (16.8) | 34 | (6.7) | 36 | (7.2) | 43 | (9.8) | 54 | (7.1) | 39 | (6.9) | 52 | (9.2) | 46 | (7.3) | 36 | (8.0) | ||||||||||||
Replacement cycle | 17 | (2.6) | 19 | (3.4) | 14 | (3.8) | # | (†) | 31 | (6.7) | 21 | (5.8) | ‡ | (†) | 10 | ! | (3.9) | 20 | (4.9) | 12 | ! | (5.5) | 13 | ! | (4.4) | 22 | ! | (6.6) | ||||||||
Other reason | 10 | (2.3) | 11 | (2.9) | 10 | ! | (3.3) | # | (†) | 11 | ! | (5.1) | 13 | ! | (4.8) | 14 | ! | (6.3) | ‡ | (†) | 13 | ! | (4.8) | ‡ | (†) | ‡ | (†) | 12 | ! | (4.9) | ||||||
Interior finishes, trim--percent of schools with plans | 12 | (0.8) | 11 | (1.0) | 13 | (1.5) | 25 | (6.8) | 13 | (1.7) | 13 | (1.6) | 12 | (2.3) | 11 | (1.3) | 14 | (1.6) | 9 | (1.7) | 11 | (1.7) | 12 | (1.9) | ||||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 19 | (3.1) | 17 | (3.7) | 27 | (5.3) | ‡ | (†) | 19 | (5.5) | 20 | ! | (6.1) | 32 | ! | (11.5) | 13 | ! | (5.7) | 17 | ! | (5.4) | 16 | ! | (6.2) | 27 | (7.0) | 16 | ! | (5.8) | ||||||
Improve operational or energy efficiency | 20 | (3.2) | 17 | (3.7) | 24 | (6.2) | 33 | ! | (16.4) | 18 | (5.4) | 17 | ! | (5.2) | 33 | ! | (10.9) | 19 | ! | (6.2) | 14 | ! | (4.8) | ‡ | (†) | 20 | (5.7) | 31 | (8.0) | |||||||
Replacement cycle | 44 | (3.9) | 48 | (5.1) | 31 | (5.1) | 49 | ! | (15.3) | 45 | (7.6) | 46 | (6.9) | 30 | ! | (10.8) | 47 | (7.7) | 50 | (6.9) | 44 | (9.0) | 39 | (7.8) | 39 | (9.0) | ||||||||||
Other reason | 17 | (3.0) | 18 | (4.0) | 19 | ! | (5.7) | # | (†) | 18 | ! | (6.5) | 18 | ! | (5.7) | ‡ | (†) | 22 | (6.2) | 19 | ! | (5.9) | 26 | ! | (8.4) | 13 | ! | (5.8) | 14 | ! | (5.7) | |||||
Plumbing/lavatories--percent of schools with plans | 13 | (1.0) | 12 | (1.2) | 17 | (1.8) | 28 | (7.2) | 15 | (2.0) | 13 | (1.9) | 16 | (2.4) | 11 | (1.5) | 13 | (1.8) | 13 | (2.0) | 13 | (1.7) | 13 | (2.2) | ||||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 25 | (3.7) | 25 | (4.6) | 21 | (3.8) | 46 | ! | (16.6) | 29 | (7.0) | 22 | (6.1) | 26 | ! | (7.9) | 24 | (7.2) | 26 | (7.4) | 29 | (8.6) | 27 | (6.1) | 20 | ! | (6.5) | |||||||||
Improve operational or energy efficiency | 35 | (3.8) | 32 | (4.7) | 41 | (5.9) | 44 | ! | (15.0) | 27 | (6.4) | 33 | (6.9) | 49 | (9.6) | 39 | (7.7) | 24 | (5.7) | 29 | (8.0) | 47 | (7.6) | 42 | (7.6) | |||||||||||
Replacement cycle | 26 | (3.1) | 28 | (4.4) | 25 | (5.0) | ‡ | (†) | 34 | (6.7) | 22 | (4.8) | 19 | ! | (7.7) | 27 | (6.5) | 29 | (5.8) | 25 | ! | (7.6) | 23 | (6.3) | 28 | (7.3) | ||||||||||
Other reason | 13 | (2.5) | 14 | (3.5) | 13 | ! | (4.1) | # | (†) | 10 | ! | (4.5) | 24 | (5.6) | ‡ | (†) | 10 | ! | (4.8) | 22 | (5.5) | 16 | ! | (6.6) | ‡ | (†) | 10 | ! | (4.9) | |||||||
Heating system--percent of schools with plans | 16 | (1.1) | 14 | (1.2) | 21 | (2.1) | 29 | (6.8) | 15 | (2.0) | 17 | (1.9) | 15 | (2.5) | 16 | (1.8) | 18 | (1.7) | 15 | (2.0) | 16 | (1.9) | 15 | (2.2) | ||||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 26 | (2.9) | 23 | (3.7) | 31 | (4.7) | 33 | ! | (14.0) | 24 | (6.1) | 24 | (6.0) | 32 | (8.8) | 27 | (6.0) | 23 | (5.3) | 31 | (8.1) | 23 | (5.3) | 30 | (7.6) | |||||||||||
Improve operational or energy efficiency | 41 | (3.1) | 34 | (3.7) | 54 | (5.4) | 54 | (14.1) | 34 | (6.8) | 37 | (5.4) | 38 | (9.6) | 51 | (6.8) | 31 | (5.0) | 38 | (8.1) | 53 | (6.8) | 45 | (7.6) | ||||||||||||
Replacement cycle | 27 | (2.9) | 35 | (4.0) | 13 | ! | (4.4) | ‡ | (†) | 35 | (6.5) | 31 | (6.0) | 23 | ! | (8.4) | 20 | (5.1) | 38 | (5.4) | 30 | (7.9) | 20 | (5.5) | 17 | ! | (6.4) | |||||||||
Other reason | 6 | (1.7) | 8 | ! | (2.7) | ‡ | (†) | # | (†) | ‡ | (†) | 8 | ! | (3.5) | ‡ | (†) | ‡ | (†) | 8 | ! | (3.8) | ‡ | (†) | ‡ | (†) | ‡ | (†) | |||||||||
Air conditioning system--percent of schools with plans | 16 | (1.1) | 14 | (1.3) | 22 | (2.2) | 17 | ! | (5.2) | 18 | (2.4) | 16 | (2.0) | 14 | (2.7) | 16 | (1.9) | 14 | (1.7) | 18 | (2.6) | 17 | (2.3) | 16 | (2.5) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 28 | (3.5) | 26 | (4.4) | 34 | (4.9) | ‡ | (†) | 25 | (6.2) | 29 | (6.7) | 31 | ! | (10.4) | 30 | (6.4) | 28 | (6.0) | 31 | (7.9) | 22 | (6.2) | 34 | (7.7) | |||||||||||
Improve operational or energy efficiency | 44 | (3.5) | 39 | (4.6) | 52 | (5.0) | 57 | ! | (19.0) | 44 | (7.4) | 43 | (5.7) | 39 | (11.1) | 46 | (7.1) | 36 | (5.9) | 44 | (8.0) | 54 | (6.4) | 40 | (7.5) | |||||||||||
Replacement cycle | 23 | (2.8) | 29 | (3.9) | 11 | ! | (3.6) | ‡ | (†) | 26 | (6.0) | 21 | (5.6) | 27 | ! | (9.6) | 20 | (5.9) | 31 | (6.0) | 19 | ! | (6.4) | 23 | (5.9) | 16 | ! | (5.9) | ||||||||
Other reason | 5 | (1.5) | 6 | ! | (2.2) | 4 | ! | (1.8) | # | (†) | ‡ | (†) | 8 | ! | (3.4) | ‡ | (†) | ‡ | (†) | ‡ | (†) | ‡ | (†) | ‡ | (†) | 10 | ! | (4.4) | ||||||||
Ventilation/filtration system--percent of schools with | ||||||||||||||||||||||||||||||||||||
plans | 11 | (0.8) | 10 | (0.9) | 15 | (1.7) | 13 | ! | (4.3) | 11 | (1.6) | 11 | (1.6) | 11 | (2.6) | 11 | (1.5) | 13 | (1.4) | 11 | (1.9) | 11 | (1.5) | 9 | (1.7) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 31 | (4.3) | 30 | (5.6) | 32 | (5.6) | ‡ | (†) | 30 | (7.4) | 26 | (7.5) | 37 | ! | (13.5) | 33 | (7.3) | 27 | (6.5) | 37 | (10.8) | 26 | (7.4) | 38 | (10.7) | |||||||||||
Improve operational or energy efficiency | 38 | (4.3) | 30 | (5.3) | 55 | (6.1) | 41 | ! | (19.2) | 39 | (8.4) | 39 | (7.2) | 28 | ! | (10.5) | 41 | (7.8) | 33 | (6.1) | 36 | (10.0) | 49 | (8.3) | 35 | (10.1) | ||||||||||
Replacement cycle | 23 | (3.4) | 29 | (5.0) | 8 | ! | (3.0) | ‡ | (†) | 19 | ! | (5.7) | 24 | (7.0) | 32 | ! | (11.6) | 22 | (6.4) | 30 | (6.7) | 25 | ! | (8.8) | 22 | ! | (6.8) | ‡ | (†) | |||||||
Other reason | 8 | (2.4) | 10 | ! | (3.5) | 5 | ! | (2.4) | # | (†) | ‡ | (†) | 11 | ! | (4.9) | ‡ | (†) | ‡ | (†) | ‡ | (†) | ‡ | (†) | ‡ | (†) | 18 | ! | (7.3) | ||||||||
Electrical system--percent of schools with plans | 9 | (0.8) | 9 | (0.9) | 10 | (1.4) | 17 | ! | (6.1) | 11 | (1.5) | 10 | (1.6) | 9 | (2.1) | 8 | (1.4) | 11 | (1.5) | 8 | (1.6) | 8 | (1.3) | 10 | (1.7) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 28 | (4.0) | 28 | (5.0) | 27 | (5.8) | ‡ | (†) | 31 | (8.2) | 32 | (7.6) | 25 | ! | (12.3) | 21 | ! | (8.4) | 23 | (6.2) | 46 | (12.9) | 24 | ! | (8.2) | 28 | ! | (8.3) | ||||||||
Improve operational or energy efficiency | 37 | (4.5) | 31 | (6.0) | 51 | (7.7) | 52 | ! | (19.2) | 29 | (7.1) | 35 | (8.5) | 42 | ! | (13.5) | 45 | (9.7) | 37 | (7.4) | 29 | ! | (11.1) | 42 | (9.6) | 38 | (9.4) | |||||||||
Replacement cycle | 22 | (3.5) | 26 | (4.9) | 11 | ! | (4.5) | ‡ | (†) | 33 | (8.3) | 16 | ! | (5.7) | 19 | ! | (9.2) | 18 | ! | (7.5) | 32 | (7.0) | ‡ | (†) | 23 | ! | (7.5) | 15 | ! | (7.5) | ||||||
Other reason | 13 | (3.2) | 15 | (4.2) | 11 | ! | (5.4) | # | (†) | ‡ | (†) | 17 | ! | (6.2) | ‡ | (†) | 15 | ! | (7.0) | ‡ | (†) | ‡ | (†) | ‡ | (†) | 19 | ! | (7.7) | ||||||||
Interior lighting--percent of schools with plans | 13 | (0.9) | 13 | (1.1) | 13 | (1.4) | 18 | ! | (6.5) | 14 | (1.9) | 14 | (1.7) | 10 | (2.3) | 12 | (1.6) | 15 | (1.6) | 10 | (1.9) | 13 | (1.7) | 12 | (2.1) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 12 | (2.6) | 13 | (3.4) | 11 | ! | (3.8) | ‡ | (†) | 12 | ! | (4.5) | 12 | ! | (5.3) | 22 | ! | (9.5) | ‡ | (†) | 11 | ! | (4.4) | ‡ | (†) | 13 | ! | (5.4) | 19 | ! | (6.5) | |||||
Improve operational or energy efficiency | 70 | (3.9) | 68 | (4.9) | 74 | (5.6) | 73 | (17.7) | 66 | (7.2) | 67 | (7.4) | 62 | (11.2) | 78 | (6.1) | 65 | (7.1) | 78 | (8.6) | 78 | (5.9) | 60 | (8.4) | ||||||||||||
Replacement cycle | 9 | (2.0) | 10 | (2.6) | 6 | ! | (2.8) | ‡ | (†) | 13 | ! | (5.5) | 8 | ! | (3.4) | ‡ | (†) | 8 | ! | (3.5) | 13 | ! | (4.3) | ‡ | (†) | 7 | ! | (3.2) | ‡ | (†) | ||||||
Other reason | 9 | (2.3) | 10 | ! | (2.9) | ‡ | (†) | # | (†) | ‡ | (†) | 13 | ! | (4.9) | ‡ | (†) | ‡ | (†) | 10 | ! | (4.6) | ‡ | (†) | ‡ | (†) | 11 | ! | (5.4) | ||||||||
Exterior lighting--percent of schools with plans | 10 | (0.8) | 9 | (1.0) | 10 | (1.3) | 18 | ! | (6.0) | 9 | (1.5) | 10 | (1.5) | 9 | (2.1) | 10 | (1.6) | 12 | (1.6) | 8 | (1.7) | 7 | (1.2) | 10 | (1.8) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 19 | (3.5) | 20 | (4.6) | 19 | ! | (5.8) | ‡ | (†) | 12 | ! | (5.2) | 14 | ! | (6.3) | 39 | ! | (14.2) | 22 | ! | (7.2) | 13 | ! | (5.5) | ‡ | (†) | 29 | ! | (9.9) | 21 | ! | (8.1) | ||||
Improve operational or energy efficiency | 56 | (4.7) | 53 | (5.9) | 62 | (6.9) | 73 | (17.2) | 50 | (9.2) | 67 | (8.8) | 47 | (13.9) | 56 | (8.5) | 57 | (7.8) | 66 | (10.9) | 48 | (10.2) | 56 | (10.2) | ||||||||||||
Replacement cycle | 14 | (3.0) | 15 | (3.9) | 10 | ! | (3.9) | ‡ | (†) | 27 | ! | (8.6) | ‡ | (†) | ‡ | (†) | 15 | ! | (6.2) | 17 | ! | (5.1) | ‡ | (†) | 17 | ! | (7.5) | ‡ | (†) | |||||||
Other reason | 11 | (3.2) | 12 | ! | (3.8) | ‡ | (†) | # | (†) | ‡ | (†) | 14 | ! | (6.1) | ‡ | (†) | ‡ | (†) | 13 | ! | (5.7) | ‡ | (†) | ‡ | (†) | ‡ | (†) | |||||||||
Energy management system--percent of schools with plans | 14 | (0.9) | 13 | (1.2) | 16 | (1.9) | 34 | (7.9) | 13 | (2.0) | 14 | (1.9) | 17 | (2.9) | 15 | (1.9) | 17 | (1.9) | 12 | (2.0) | 14 | (1.9) | 14 | (2.0) | ||||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 14 | (2.4) | 13 | (3.2) | 15 | (4.1) | ‡ | (†) | 19 | ! | (5.9) | ‡ | (†) | 21 | ! | (7.9) | 11 | ! | (4.2) | 16 | (4.4) | ‡ | (†) | 16 | ! | (5.7) | 11 | ! | (5.2) | |||||||
Improve operational or energy efficiency | 65 | (3.6) | 64 | (4.5) | 66 | (6.0) | 68 | (14.8) | 59 | (8.7) | 63 | (7.3) | 64 | (10.3) | 71 | (5.6) | 58 | (6.8) | 68 | (8.4) | 72 | (6.3) | 67 | (8.4) | ||||||||||||
Replacement cycle | 14 | (2.7) | 16 | (3.5) | 9 | ! | (4.3) | ‡ | (†) | 13 | ! | (5.6) | 16 | ! | (6.2) | 13 | ! | (5.1) | 14 | ! | (5.0) | 20 | (5.8) | 15 | ! | (6.7) | 8 | ! | (3.4) | ‡ | (†) | |||||
Other reason | 7 | (2.0) | 7 | ! | (2.6) | 9 | ! | (4.1) | # | (†) | ‡ | (†) | 12 | ! | (4.8) | ‡ | (†) | ‡ | (†) | ‡ | (†) | ‡ | (†) | ‡ | (†) | 11 | ! | (5.3) | ||||||||
Life safety features1 --percent of schools with plans | 12 | (0.8) | 11 | (1.0) | 12 | (1.5) | 16 | ! | (5.8) | 11 | (1.6) | 13 | (1.8) | 16 | (2.7) | 10 | (1.5) | 13 | (1.8) | 12 | (2.0) | 11 | (1.8) | 9 | (1.7) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 24 | (3.7) | 23 | (4.4) | 23 | (5.8) | ‡ | (†) | 22 | ! | (7.5) | 30 | (7.8) | 21 | ! | (7.7) | 21 | ! | (6.6) | 26 | (6.2) | 36 | (9.4) | 20 | ! | (6.3) | 12 | ! | (4.7) | |||||||
Improve operational or energy efficiency | 37 | (4.2) | 34 | (4.9) | 41 | (6.9) | 60 | ! | (22.4) | 42 | (8.3) | 33 | (7.6) | 40 | (8.5) | 35 | (8.1) | 31 | (6.9) | 29 | (7.9) | 41 | (8.2) | 51 | (9.6) | |||||||||||
Replacement cycle | 21 | (3.0) | 22 | (4.0) | 19 | (4.9) | ‡ | (†) | 24 | ! | (7.5) | 19 | ! | (6.6) | 24 | ! | (8.7) | 18 | ! | (6.0) | 23 | (6.0) | 17 | ! | (6.2) | 20 | ! | (6.2) | 20 | ! | (8.6) | |||||
Other reason | 19 | (3.5) | 21 | (4.2) | 16 | ! | (5.5) | # | (†) | ‡ | (†) | 19 | ! | (5.8) | 16 | ! | (6.7) | 26 | ! | (8.2) | 19 | ! | (6.0) | 19 | ! | (8.1) | 19 | ! | (6.7) | 17 | ! | (7.2) | ||||
Security systems--percent of schools with plans | 21 | (1.2) | 20 | (1.5) | 20 | (1.9) | 32 | (7.4) | 16 | (2.1) | 19 | (2.0) | 24 | (3.1) | 24 | (2.2) | 23 | (2.2) | 19 | (2.7) | 21 | (2.2) | 17 | (2.3) | ||||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 22 | (2.8) | 22 | (3.5) | 25 | (4.4) | ‡ | (†) | 19 | ! | (5.7) | 16 | (4.7) | 33 | (7.5) | 24 | (4.6) | 17 | (3.8) | 33 | (7.7) | 22 | (4.9) | 21 | (6.1) | |||||||||||
Improve operational or energy efficiency | 46 | (3.0) | 44 | (3.7) | 50 | (5.5) | 67 | (12.3) | 43 | (7.2) | 53 | (6.2) | 51 | (7.6) | 41 | (5.3) | 48 | (5.2) | 36 | (7.2) | 48 | (5.7) | 48 | (8.0) | ||||||||||||
Replacement cycle | 9 | (1.8) | 10 | (2.3) | 10 | ! | (3.1) | # | (†) | 14 | ! | (5.1) | 8 | ! | (2.5) | ‡ | (†) | 9 | ! | (3.1) | 13 | (3.6) | ‡ | (†) | 7 | ! | (3.0) | ‡ | (†) | |||||||
Other reason | 22 | (3.0) | 25 | (3.9) | 15 | (4.3) | ‡ | (†) | 24 | (6.9) | 22 | (5.5) | 9 | ! | (4.2) | 26 | (4.8) | 21 | (4.7) | 25 | (6.9) | 22 | (4.8) | 22 | (6.6) | |||||||||||
Internal communication systems--percent of schools with | ||||||||||||||||||||||||||||||||||||
plans | 14 | (1.0) | 13 | (1.2) | 16 | (2.1) | 23 | ! | (7.0) | 13 | (2.0) | 13 | (1.7) | 16 | (2.6) | 14 | (1.7) | 15 | (1.8) | 12 | (2.1) | 14 | (1.8) | 14 | (2.5) | |||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 24 | (3.3) | 21 | (4.2) | 28 | (5.5) | 37 | ! | (18.4) | 24 | (6.4) | 19 | ! | (5.9) | 17 | ! | (6.7) | 30 | (6.2) | 21 | (5.2) | 31 | (8.0) | 23 | (6.3) | 24 | (7.0) | |||||||||
Improve operational or energy efficiency | 43 | (3.5) | 39 | (4.7) | 49 | (6.9) | 63 | (18.4) | 41 | (7.3) | 50 | (8.1) | 42 | (9.1) | 39 | (7.0) | 43 | (6.3) | 47 | (9.5) | 39 | (7.5) | 44 | (7.1) | ||||||||||||
Replacement cycle | 21 | (3.1) | 25 | (4.2) | 12 | ! | (3.8) | # | (†) | 21 | (6.4) | 15 | ! | (5.2) | 34 | (9.3) | 19 | ! | (5.7) | 25 | (6.2) | ‡ | (†) | 22 | (6.5) | 19 | ! | (6.3) | ||||||||
Other reason | 13 | (2.7) | 15 | (3.5) | 11 | ! | (4.6) | # | (†) | 14 | ! | (6.2) | 16 | ! | (5.7) | ‡ | (†) | 12 | ! | (4.8) | 12 | ! | (4.8) | ‡ | (†) | 16 | ! | (5.3) | 13 | ! | (5.5) | |||||
Technology infrastructure--percent of schools with plans | 20 | (1.0) | 19 | (1.2) | 23 | (2.2) | 33 | (7.4) | 17 | (2.1) | 20 | (2.1) | 23 | (2.8) | 21 | (2.0) | 23 | (2.0) | 20 | (2.6) | 18 | (2.1) | 19 | (2.6) | ||||||||||||
Percentage distribution by main reason for the plans | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | 100 | (†) | ||||||||||||
Functional problem in existing system or feature | 17 | (2.4) | 16 | (3.0) | 19 | (4.1) | ‡ | (†) | 16 | ! | (5.0) | 11 | ! | (4.1) | 16 | ! | (5.6) | 22 | (4.7) | 14 | (3.8) | 17 | ! | (5.9) | 16 | (4.6) | 23 | (5.3) | ||||||||
Improve operational or energy efficiency | 51 | (3.3) | 46 | (4.2) | 59 | (5.0) | 71 | (14.0) | 53 | (6.5) | 51 | (6.5) | 65 | (7.3) | 44 | (5.3) | 44 | (4.9) | 53 | (7.3) | 59 | (6.6) | 51 | (6.5) | ||||||||||||
Replacement cycle | 21 | (2.6) | 25 | (3.4) | 14 | (3.4) | ‡ | (†) | 21 | (5.5) | 21 | (4.5) | 10 | ! | (4.6) | 26 | (5.1) | 28 | (5.1) | 19 | ! | (6.0) | 19 | (5.4) | 15 | ! | (4.8) | |||||||||
Other reason | 11 | (2.0) | 13 | (2.7) | 8 | ! | (2.9) | # | (†) | 9 | ! | (4.3) | 17 | (4.5) | ‡ | (†) | 8 | ! | (3.6) | 13 | (3.7) | 11 | ! | (4.5) | 6 | ! | (2.9) | 12 | ! | (4.8) |
†Not applicable. | ||||||||||||||||||||||||||||||||||||
#Rounds to zero. | ||||||||||||||||||||||||||||||||||||
!Interpret data with caution. The coefficient of variation (CV) for this estimate is between 30 and 50 percent. | ||||||||||||||||||||||||||||||||||||
‡Reporting standards not met. Either there are too few cases for a reliable estimate or the coefficient of variation (CV) for this estimate is 50 percent or greater. | ||||||||||||||||||||||||||||||||||||
1 Life safety features include sprinklers, fire alarms, and smoke detectors. | ||||||||||||||||||||||||||||||||||||
NOTE: Percentage of schools with major repair, renovation, or replacement plans is based on schools having the specified building system or feature. Detail may not sum to totals because of rounding. | ||||||||||||||||||||||||||||||||||||
SOURCE: U.S. Department of Education, National Center for Education Statistics, Fast Response Survey System (FRSS), "Condition of Public School Facilities: 2012-13," FRSS 105, 2013. (This table was prepared April 2014.) |